Courtesy NDOT
Current Nevada law (NRS 484B.607, originally added to NRS in 2003) requires drivers to slow down, proceed with caution, and if possible, move to the far lane when passing an official emergency response vehicle(s) pulled over on the side of the road with amber lights flashing.
The updated law requires drivers to also do the same for Nevada Department of Transportation vehicles which are stopped on the side of the road with their flashing amber or non-flashing blue lights on.
Such lights are often used on NDOT vehicles to warn drivers of an immediate traffic hazard, as well as when employees are constructing, maintaining or repairing highways.
NDOT Roadway Maintenance/Construction
NDOT has more than 600 vehicles and approximately 2,000 pieces of heavy equipment such as snow plows.
NDOT has approximately 850 roadway maintenance and 350 construction administration professionals responsible for maintenance and construction improvements on more than 5,000 miles of state roadway.
NDOT maintenance professionals perform as many as 100 different roadway maintenance tasks, from resurfacing state roads to removing snow. They are often some of the very first on scene to assist drivers and emergency responders when there is a roadway incident.
In total, 24 NDOT employees have been killed in the line of duty since 1948. The most recent NDOT employee to die in the line of duty was Ron Raiche, Jr., who was struck and killed by an inattentive driver on March 30, 2015 while repairing roadway cracking on Interstate 80 near Battle Mountain.
The law also includes NDOT’s approximately 10 Freeway Service Patrol vehicles which help keeping traffic moving smoothly in Reno and Las Vegas.
Specifics of the Law
The updated law becomes effective July 1, 2017.
Drivers found guilty of violating the law can be charged with a misdemeanor.
Many states, including California, Utah, Georgia, Indiana, Iowa, Kansas, Kentucky, Michigan, Tennessee and Wisconsin currently have “move over” laws which include state department of transportation maintenance vehicles.
“Each and every NDOT employee works to keep our roads mobile and safe,” NDOT Director Rudy Malfabon said. “This law will in turn give our NDOT employees an extra measure of roadway safety. Earlier in my NDOT career, I worked on our road construction crews. Now, as NDOT director, I observe the daily efforts of our dedicated NDOT employees that keep our roadsides safe and clear. This law will help keep our state road maintenance and construction crews, as well as drivers, that much safer.”

COMMENTS
Comment author: John Mueller
Comment text: FERNLEY’S WATER EMERGENCY: FIVE QUESTIONS STILL NEED ANSWERS
The November 12 Fernley Reporter article provides a good recap of the November 3 water emergency and the November 4 City Council meeting.
First, credit where credit is due. Our city employees responded, restored operations, and took precautions to protect residents. That’s important and appreciated.
But fixing the immediate problem isn’t the same as preventing it from happening again.
There are five reasonable questions our community deserves answers to:
1. WHAT ACTUALLY FAILED?
What was the root cause of the water treatment plant’s communication failure, and why didn’t the backup systems prevent the interruption?
2. HOW CLOSE WERE WE TO A REAL EMERGENCY?
How much usable water remained in storage, and how close did we come to affecting essential services, including firefighting?
3. WHAT WILL THIS COST TAXPAYERS AND RATEPAYERS?
What did the emergency cost, what additional repairs or upgrades are necessary, and how will they be funded?
4. WHO IS RESPONSIBLE FOR MAKING SURE IT DOESN’T HAPPEN AGAIN?
Is there a written corrective-action plan with assigned responsibilities, measurable results, and completion deadlines?
5. HOW WILL RESIDENTS KNOW THE PROBLEM IS REALLY FIXED?
Will the city publish an after-action report explaining what happened, what was learned, what has been corrected, and what still needs attention?
This isn’t about pointing fingers or finding someone to blame. It’s about learning, improving, and protecting our community.
We can appreciate the city’s response while still expecting transparency, accountability, and a commitment to continuous improvement.
Some technical information may need to remain confidential for security reasons. But that shouldn’t prevent residents from understanding the risks, the corrective actions, and the results.
The real question isn’t whether Fernley recovered from the November 3 emergency. We know it did.
The question is: If the same failure happened tomorrow, would we be better prepared?
That’s a conversation worth having.
Our community deserves more than reassurance. It deserves measurable results.
Comment publication date: 11/12/26, 1:54 PM
Comment source: Fernley Council Addresses Water Emergency
Comment author: Donald DeVold
Comment text: Great article
It’s actually spelled DeVold
Thank you
Comment publication date: 10/29/26, 4:58 PM
Comment source: The great robbery: Strip-6 by Solis helps Vaqueros punch playoff ticket
Comment author: CH
Comment text: I want to start a betting 'pool' for the October, November, and December closures:
1. A dent in the pool slide.
2. A failed breaker.
3. A pebble loose in the water part (replacing all concrete)
4. Hurricane Polo makes a sudden turn and blows off the roof (again).
With soft muscles after 7 months of no swimming, the only health left is my sense of humor :)
Comment publication date: 10/1/26, 11:18 AM
Comment source: Fernley Pool Renovation Moves Forward, One Test at a Time
Comment author: PFB
Comment text: Why can't you guys find competent contractors.. For a large municipal facility like the indoor-outdoor Fernley Swimming Pool located at 300 Cottonwood Lane, a complete ground-up commercial build or major structural renovation typically spans 6 to 12 months or longer when factoring in large-scale engineering, public municipal permitting, specialized commercial HVAC/roofing, and health department inspections. The current renovation has been- The Fernley Swimming Pool has been closed for approximately six to seven months since late February 2026 for a major roof replacement and facility renovation. Now you sat October. Soooo 8 months for a new roof. The picture shows no other renovations.
Comment publication date: 9/17/26, 7:14 PM
Comment source: Electrical problem delays Fernley pool opening
Comment author: P
Comment text: Relative of the Mayor is to over see this site. Anyone who knows Fernley KNOWS this is more of the who you are related to and know business in this town. VOTE THEM ALL OUT AND THE CALIFORNIA TRANSPLANTS.
Comment publication date: 9/16/26, 10:31 PM
Comment source: Lift Station Failure Released Untreated Sewage
Comment author: Christopher Walsh
Comment text: Could you look into the strong recurring smell around Fernley? It smells like sewage and it can be bad enough that people don’t want to be outside or open their windows.
It would be helpful to get an investigative journalist help the Fernley residents get a clear answer from the City, NDEP, and any involved facilities.
I was really disappointed that the smell was not disclosed by my realtor when I moved here. I enjoy Fernley and am seeing the improvements that are being made.
With Appreciation
Comment publication date: 9/12/26, 2:49 PM
Comment source: Sewage spill near City of Fernley Municipal Well 9
Temperature: 44°F Town: Fernley
Pressure: 1011 hPa
Wind: 5 mph
Comment
Comments