Go to main contentsGo to main menu
Monday, November 16, 2026 at 2:10 PM

Turnovers, fourth-down swings end Fernley’s season at Spring Creek

Turnovers, fourth-down swings end Fernley’s season at Spring Creek
Fernley’s Brendon Magill (6) tackles Spring Creek’s Aiden Keim on a kickoff return during last Friday’s playoff game. Photo by Leanne Cruz, Cruz Down Memory Lane Photography

The fine margins of playoff football ultimately cost the Fernley Vaqueros in their season-ending 27-7 loss at Spring Creek last Friday.

Three critical fourth-down plays and a devastating turnover with less than a minute left in the first half put the No. 6-seeded Vaqueros into a hole too deep to climb out of.

“In the end, it comes down to executing, it comes down to valuing the football and making tackles and I think we did two of the three of those,” coach Anfernee Sloan said. “I'm proud of them because they gave themselves the best opportunity to go in and win the game, and I don't think they understand that when they look at that score.”

Spring Creek capitalized on two second-quarter turnovers to go into halftime with not just a 21-0 lead, but with a devastating shift in momentum.

The Vaqueros drove to the Spring Creek 12-yard line on their opening possession, but a false start penalty on 4th-and-2 moved the ball back five yards and a pass on 4th-and-7 was incomplete.

Spring Creek drove 83 yards in 13 plays to take a 7-0 lead on a 5-yard run by Landon Boyle, thanks in part to a 4th-and-1 conversion that kept the drive alive. 

Then the Spartans scored twice in the final three and a half minutes of the second quarter. The first came when Fernley fumbled on 4th-and-2 from the Spring Creek 44-yard line. Spring Creek recovered at its own 46 and drove 54 yards in nine plays, scoring on a 4-yard run by Boyle with 3:34 left in the quarter to go up 14-0.

The Vaqueros tried to answer before the half, but after getting a first down, a fumbled option pitch gave the Spartans the ball at the Fernley 22-yard line. On the next play, quarterback McCoy McArtor dropped a perfect pass right to the back corner of the end zone where Nolan Francis made the catch just before going out of bounds.

Where moments before they had been driving with the chance to tie the game at 7, the Vaqueros went to the locker room trailing 21-0.

“That’s just the nature of the beast there, like that’s just how football is,” Sloan said. “What if they would have swung the other way? We’re up 21-0.”

Fernley came out of the half with its best drive of the game, 12 plays in 7 minutes, 7 seconds, to get onto the board with a 5-yard touchdown pass from Elijah DeVold to Jayse Jones.

Fernley forced an incomplete pass on fourth down on Spring Creek’s next possession, but the Vaqueros got stuffed for no gain on 4th-and-1 from their own 45-yard line with 11:03 left in the fourth quarter, and the Spartans put the game away with a 15-yard pass from McArtor to Boyle with 7:12 left.

After the last of his players had left the field, Sloan said several of the seniors who endured two tough seasons on JV before being part of a good team last year, then won two straight games to give themselves an opportunity to make playoff a run this year.

“That's why it's emotional, because they put a lot of time into this and they're committed to the football program, they're committed to the city of Fernley, and they're committed to this brotherhood that we have established in our culture,” Sloan said. “I'm grateful for it because I didn't create that, those guys did that, and their emotions speak thousands of words.”


Share
Rate

Comment

Comments

COMMENTS
Comment author: John Mueller Comment text: FERNLEY’S WATER EMERGENCY: FIVE QUESTIONS STILL NEED ANSWERS The November 12 Fernley Reporter article provides a good recap of the November 3 water emergency and the November 4 City Council meeting. First, credit where credit is due. Our city employees responded, restored operations, and took precautions to protect residents. That’s important and appreciated. But fixing the immediate problem isn’t the same as preventing it from happening again. There are five reasonable questions our community deserves answers to: 1. WHAT ACTUALLY FAILED? What was the root cause of the water treatment plant’s communication failure, and why didn’t the backup systems prevent the interruption? 2. HOW CLOSE WERE WE TO A REAL EMERGENCY? How much usable water remained in storage, and how close did we come to affecting essential services, including firefighting? 3. WHAT WILL THIS COST TAXPAYERS AND RATEPAYERS? What did the emergency cost, what additional repairs or upgrades are necessary, and how will they be funded? 4. WHO IS RESPONSIBLE FOR MAKING SURE IT DOESN’T HAPPEN AGAIN? Is there a written corrective-action plan with assigned responsibilities, measurable results, and completion deadlines? 5. HOW WILL RESIDENTS KNOW THE PROBLEM IS REALLY FIXED? Will the city publish an after-action report explaining what happened, what was learned, what has been corrected, and what still needs attention? This isn’t about pointing fingers or finding someone to blame. It’s about learning, improving, and protecting our community. We can appreciate the city’s response while still expecting transparency, accountability, and a commitment to continuous improvement. Some technical information may need to remain confidential for security reasons. But that shouldn’t prevent residents from understanding the risks, the corrective actions, and the results. The real question isn’t whether Fernley recovered from the November 3 emergency. We know it did. The question is: If the same failure happened tomorrow, would we be better prepared? That’s a conversation worth having. Our community deserves more than reassurance. It deserves measurable results. Comment publication date: 11/12/26, 1:54 PM Comment source: Fernley Council Addresses Water Emergency Comment author: Donald DeVold Comment text: Great article It’s actually spelled DeVold Thank you Comment publication date: 10/29/26, 4:58 PM Comment source: The great robbery: Strip-6 by Solis helps Vaqueros punch playoff ticket Comment author: CH Comment text: I want to start a betting 'pool' for the October, November, and December closures: 1. A dent in the pool slide. 2. A failed breaker. 3. A pebble loose in the water part (replacing all concrete) 4. Hurricane Polo makes a sudden turn and blows off the roof (again). With soft muscles after 7 months of no swimming, the only health left is my sense of humor :) Comment publication date: 10/1/26, 11:18 AM Comment source: Fernley Pool Renovation Moves Forward, One Test at a Time Comment author: PFB Comment text: Why can't you guys find competent contractors.. For a large municipal facility like the indoor-outdoor Fernley Swimming Pool located at 300 Cottonwood Lane, a complete ground-up commercial build or major structural renovation typically spans 6 to 12 months or longer when factoring in large-scale engineering, public municipal permitting, specialized commercial HVAC/roofing, and health department inspections. The current renovation has been- The Fernley Swimming Pool has been closed for approximately six to seven months since late February 2026 for a major roof replacement and facility renovation. Now you sat October. Soooo 8 months for a new roof. The picture shows no other renovations. Comment publication date: 9/17/26, 7:14 PM Comment source: Electrical problem delays Fernley pool opening Comment author: P Comment text: Relative of the Mayor is to over see this site. Anyone who knows Fernley KNOWS this is more of the who you are related to and know business in this town. VOTE THEM ALL OUT AND THE CALIFORNIA TRANSPLANTS. Comment publication date: 9/16/26, 10:31 PM Comment source: Lift Station Failure Released Untreated Sewage Comment author: Christopher Walsh Comment text: Could you look into the strong recurring smell around Fernley? It smells like sewage and it can be bad enough that people don’t want to be outside or open their windows. It would be helpful to get an investigative journalist help the Fernley residents get a clear answer from the City, NDEP, and any involved facilities. I was really disappointed that the smell was not disclosed by my realtor when I moved here. I enjoy Fernley and am seeing the improvements that are being made. With Appreciation Comment publication date: 9/12/26, 2:49 PM Comment source: Sewage spill near City of Fernley Municipal Well 9