Go to main contentsGo to main menu
Saturday, November 28, 2026 at 6:35 AM
Ad

Coalition honors 24 veterans in memorial service

Coalition honors 24 veterans in memorial service

Former military men, women called ‘defenders of freedom, country and flag

Members of the Nevada Veterans Coalition salute during a ceremony for unaccompanied veterans. Steve Ranson/LVN

By Steve Ranson, Nevada News Group

The Nevada Veterans Coalition remembered 24 veterans Thursday in the first unaccompanied service since February at the Northern Nevada Veterans Memorial Cemetery.

Because of restrictions placed on state facilities because of the coronavirus pandemic, all services were placed on hold, although the individual veterans were interred at the cemetery. The state cemetery is one of two located in Nevada. The other cemetery is located in Boulder City.

NVC member and narrator Sharon Serenko said the service gives veterans their final closure and thanks them for their duty to country and their heroism to service. She reflected on the veterans as defenders of freedom, country and flag and said their deeds will live in our hearts.

“Every monument tells a story of a life given in service to others,” Serenko stressed.

After reading the names of the 24 veterans, she said it was an honor to know of these men and women.

“Soul after soul, we shall follow these departed veterans into the eternity beyond,” she said.

One such veteran was Fernley resident Robert Kizer, who served in the Navy during World War II.

As an 18-year-old gunner, Kizer never regretted enlisting in the Navy during World War II. The Navy petty officer first class said he felt fear every time he climbed into a TBM torpedo bomber, lifting off from an aircraft carrier in search of the enemy.

Known as one of the heaviest single-engine aircraft during World War II, the General Motors-built TBM Avenger flew a crew of three: a pilot, turret gunner and a radioman/bombardier/ventral gunner. In the bomb bay the Avenger carried one large torpedo or a single 2,000-pound bomb. Sometimes, crews would swap out one large bomb for four 500-pounders.

Kizer saw action in the South Pacific during the final two years of the war. His squadron, which was attached to the aircraft carrier USS Admiralty Islands, called Pearl Harbor home. Kizer served for two years on board the aircraft carrier before he was discharged at the end of the war at Pearl Harbor.

The service included a three-round volley from the NVC honor guard, the playing of “Taps,” a flag-folding ceremony conducted by Nevada Army National Guard soldiers Sgt. Christine Aguilar and Sgt. Manuel Monroy. Aguilar then presented the flag to Diane Martinez.

Other veterans remembered at the ceremony included the following: CS2 Donald Bartlett, Navy; Cpl. Danny Borgan, Army; Pvt. Steven Broussard, Army; Spec. 4 Samuel Casey, Army; HM2 Dorothy Davidson, Navy; Pvt. First Class Joseph Dean, Army; Spc. Kenneth Draves, Army; Petty Officer John Fitzpatrick; SN Frederick Fricke, Navy; Airman 2nd Class Roy Halvorsen, Air Force; Pvt. First Class Milton Linrud, Army; Pvt. First Class Stanley Marble, Army;  Pvt. First Class John Marshall, USMC; Airman 1st Class Jack McFarland, Air Force; PO2 Donald Mentzer, Navy; SR Donald Porter, Navy; Pvt. Steven Schoff; Pvt. Mark Spradley, Army; CS3 Ray Swinney; AA Robert Tarver, Navy; Pvt. Kimberly Tschirhart, Army; SN1 Wesley Wilkinson, Coast Guard; and Capt. Greg Zuniga, Marine Corps.

Sgt. Christina Aguilar of the Nevada Army National Guard presents a flag to Diane Martinez. Steve Ranson/LVN
Sgt. Manuel Monroy of the Nevada Army National Guard folds a flag during Friday’s unaccompanied service for veterans. Steve Ranson/LVN
The Nevada Veterans Coalition honor guard parades the colors. Steve Ranson/LVN
The Patriot Guard Riders march flags down to the pavilion. Steve Ranson / LVN

Share
Rate

Comment

Comments

COMMENTS
Comment author: John Mueller Comment text: FERNLEY’S WATER EMERGENCY: FIVE QUESTIONS STILL NEED ANSWERS The November 12 Fernley Reporter article provides a good recap of the November 3 water emergency and the November 4 City Council meeting. First, credit where credit is due. Our city employees responded, restored operations, and took precautions to protect residents. That’s important and appreciated. But fixing the immediate problem isn’t the same as preventing it from happening again. There are five reasonable questions our community deserves answers to: 1. WHAT ACTUALLY FAILED? What was the root cause of the water treatment plant’s communication failure, and why didn’t the backup systems prevent the interruption? 2. HOW CLOSE WERE WE TO A REAL EMERGENCY? How much usable water remained in storage, and how close did we come to affecting essential services, including firefighting? 3. WHAT WILL THIS COST TAXPAYERS AND RATEPAYERS? What did the emergency cost, what additional repairs or upgrades are necessary, and how will they be funded? 4. WHO IS RESPONSIBLE FOR MAKING SURE IT DOESN’T HAPPEN AGAIN? Is there a written corrective-action plan with assigned responsibilities, measurable results, and completion deadlines? 5. HOW WILL RESIDENTS KNOW THE PROBLEM IS REALLY FIXED? Will the city publish an after-action report explaining what happened, what was learned, what has been corrected, and what still needs attention? This isn’t about pointing fingers or finding someone to blame. It’s about learning, improving, and protecting our community. We can appreciate the city’s response while still expecting transparency, accountability, and a commitment to continuous improvement. Some technical information may need to remain confidential for security reasons. But that shouldn’t prevent residents from understanding the risks, the corrective actions, and the results. The real question isn’t whether Fernley recovered from the November 3 emergency. We know it did. The question is: If the same failure happened tomorrow, would we be better prepared? That’s a conversation worth having. Our community deserves more than reassurance. It deserves measurable results. Comment publication date: 11/12/26, 1:54 PM Comment source: Fernley Council Addresses Water Emergency Comment author: Donald DeVold Comment text: Great article It’s actually spelled DeVold Thank you Comment publication date: 10/29/26, 4:58 PM Comment source: The great robbery: Strip-6 by Solis helps Vaqueros punch playoff ticket Comment author: CH Comment text: I want to start a betting 'pool' for the October, November, and December closures: 1. A dent in the pool slide. 2. A failed breaker. 3. A pebble loose in the water part (replacing all concrete) 4. Hurricane Polo makes a sudden turn and blows off the roof (again). With soft muscles after 7 months of no swimming, the only health left is my sense of humor :) Comment publication date: 10/1/26, 11:18 AM Comment source: Fernley Pool Renovation Moves Forward, One Test at a Time Comment author: PFB Comment text: Why can't you guys find competent contractors.. For a large municipal facility like the indoor-outdoor Fernley Swimming Pool located at 300 Cottonwood Lane, a complete ground-up commercial build or major structural renovation typically spans 6 to 12 months or longer when factoring in large-scale engineering, public municipal permitting, specialized commercial HVAC/roofing, and health department inspections. The current renovation has been- The Fernley Swimming Pool has been closed for approximately six to seven months since late February 2026 for a major roof replacement and facility renovation. Now you sat October. Soooo 8 months for a new roof. The picture shows no other renovations. Comment publication date: 9/17/26, 7:14 PM Comment source: Electrical problem delays Fernley pool opening Comment author: P Comment text: Relative of the Mayor is to over see this site. Anyone who knows Fernley KNOWS this is more of the who you are related to and know business in this town. VOTE THEM ALL OUT AND THE CALIFORNIA TRANSPLANTS. Comment publication date: 9/16/26, 10:31 PM Comment source: Lift Station Failure Released Untreated Sewage Comment author: Christopher Walsh Comment text: Could you look into the strong recurring smell around Fernley? It smells like sewage and it can be bad enough that people don’t want to be outside or open their windows. It would be helpful to get an investigative journalist help the Fernley residents get a clear answer from the City, NDEP, and any involved facilities. I was really disappointed that the smell was not disclosed by my realtor when I moved here. I enjoy Fernley and am seeing the improvements that are being made. With Appreciation Comment publication date: 9/12/26, 2:49 PM Comment source: Sewage spill near City of Fernley Municipal Well 9