Go to main contentsGo to main menu
Monday, November 2, 2026 at 2:04 AM
Ad

Economy-assisting TAACCCT funding nearing end for WNC

Economy-assisting TAACCCT funding nearing end for WNC
Mackenzie Leis, left, practices lood pressure-taking techniques on Alaina Roseland in a Certified Nursing Assistant class at the Fallon campus of Western Nevada College in Fallon on Oct. 9, 2017.


Courtesy Steve Yingling, Western Nevada Collegte

In the grips of a recession back in the early part of this decade, the U.S. Department of Labor enlisted Western Nevada College — and other community colleges nationwide — to develop work-training programs as a catalyst to improve the economy.

Through funding from the Trade Adjustment Assistance Community College and Career Training Grant, WNC was able to develop and expand multiple skilled labor training programs for students to spur employment growth and support the needs of local/regional industry. These programs included industry trades, advanced manufacturing, computer networking and medical services.

But that funding is coming to an end.

The fourth-and-final round of TAACCCT funding will end on Sept. 30, leaving behind a high rate of student certification/credential success, equipment upgrades, safer education options for students and successful job placement.

Humberto Vera, left, and John-Michael Juneau work in a machine tool class at Western Nevada College in Carson City on Sept. 27, 2017.


In all, WNC was able to serve 776 students through three rounds of TAACCCT funding and there was an average of $8,300 spent per student during their involvement with specific training programs, according to TAACCCT grant project director Gregory Sly.

More than 90 percent of students completed training requirements and earned at least one credential or certification, Sly said. Moreover, these students found jobs quickly or decided to continue their education.

During the final round of funding, which totaled $4,406,143 and began in October 2014, the TAACCCT Grant expanded WNC’s nursing program to the Fallon campus, including a full-time nursing instructor and Certified Nursing Assistant instruction. This enabled students in this rural area to avoid relocation or the dangers of long-distance commuting. Sixteen students participated in the rural nursing program through the help of the grant, with six graduating in May.

In addition to nursing, TAACCCT funding assisted WNC’s accelerated programs in machine tool technology and welding technology, as well as the CNA certification. During this time, 393 students participated in these programs with a 96 percent completion rate, according to Sly.

Chase Thompson watches as Candi Gray works in a welding class at Western Nevada College in Carson City on Sept. 14, 2017.


Additionally, Round 4 funding paid for consumable supplies and equipment, some training for staff, consultants for grant project evaluation, database design/access and wage data placement information access. Funds were used to pay for grant management staff, student advisement in CTE and Certified Nursing Assistant programs, job placement services, teaching assistants for accelerated welding and MTT programs, instructors for added courses and accelerated programs as well. TAACCCT also funded the Veterans Resource Centers at three colleges.

As the lead college for Nevada overseeing the TAACCCT Round 4 Project, WNC sub-awarded funds to Truckee Meadows Community College and Great Basin College.

Here are highlights of each round of funding WNC received:

  • TAACCCT Round 1


October 2011-September 2015

WNC received: $450,000

Programs offered: accelerated automotive, certified nursing assistant, accelerated machine tool technology and accelerated welding technology

Participants: 140 students

Equipment upgrades: The Welding Lab received updated equipment in the amount of $30,145.77

  • TAACCCT Round 3


October 2013-September 2017

WNC received: $1,567,530

Programs offered: accelerated machine tool technology, accelerated welding technology, applied industrial technology and CISCO certified networking

Participants: 243 students

Equipment upgrades: The welding, industrial systems and CISCO training labs received updated equipment in the amount of $200,282.32. Special capital improvement project of $151,000 provided electrical upgrades for industrial lab facilities

  • TAACCCT Round 4


October 2014-September 2018

WNC received: $4,406,143

Programs offered: Accelerated machine tool technology, accelerated welding technology, certified nursing assistant and rural nursing at Fallon campus

Participants: 393 students (96 percent success rate for certified program completion)

Equipment upgrades: The machine tool and nursing labs received updated equipment in the amount of $388,164.91

According to data gathered by the Lumina Foundation, four out of five jobs lost during the recession were those requiring high school education or less. By 2020, two-thirds of all jobs will require postsecondary education: https://www.luminafoundation.org/facts-and-figures.  This data supports the need for postsecondary education as individuals prepare for the current and emerging workforce.

The TAACCCT rounds provided WNC with the opportunity to modernize several labs and offer accelerated programs designed to meet industry needs.

Moving forward, WNC’s Career and Technical Education division will budget for equipment maintenance. Professionals within the division will continue to explore scheduling options for students to gain education and hands-on skills required for certification. Because industry certifications provide a common assessment of acquired skills; these certifications are used for screening and selection of potential employees, professional development and promotion within an organization.

“WNC’s CTE division thanks the Department of Labor for providing the grant funding allowing modernization to the extent that would not have been possible without this level of funding,” said WNC CTE Director Dr. Georgia White. “The TAACCCT grant impacted not just individuals but the entire region by providing skilled talent to support economic development.”

Share
Rate

Comment

Comments

COMMENTS
Comment author: Donald DeVold Comment text: Great article It’s actually spelled DeVold Thank you Comment publication date: 10/29/26, 4:58 PM Comment source: The great robbery: Strip-6 by Solis helps Vaqueros punch playoff ticket Comment author: CH Comment text: I want to start a betting 'pool' for the October, November, and December closures: 1. A dent in the pool slide. 2. A failed breaker. 3. A pebble loose in the water part (replacing all concrete) 4. Hurricane Polo makes a sudden turn and blows off the roof (again). With soft muscles after 7 months of no swimming, the only health left is my sense of humor :) Comment publication date: 10/1/26, 11:18 AM Comment source: Fernley Pool Renovation Moves Forward, One Test at a Time Comment author: PFB Comment text: Why can't you guys find competent contractors.. For a large municipal facility like the indoor-outdoor Fernley Swimming Pool located at 300 Cottonwood Lane, a complete ground-up commercial build or major structural renovation typically spans 6 to 12 months or longer when factoring in large-scale engineering, public municipal permitting, specialized commercial HVAC/roofing, and health department inspections. The current renovation has been- The Fernley Swimming Pool has been closed for approximately six to seven months since late February 2026 for a major roof replacement and facility renovation. Now you sat October. Soooo 8 months for a new roof. The picture shows no other renovations. Comment publication date: 9/17/26, 7:14 PM Comment source: Electrical problem delays Fernley pool opening Comment author: P Comment text: Relative of the Mayor is to over see this site. Anyone who knows Fernley KNOWS this is more of the who you are related to and know business in this town. VOTE THEM ALL OUT AND THE CALIFORNIA TRANSPLANTS. Comment publication date: 9/16/26, 10:31 PM Comment source: Lift Station Failure Released Untreated Sewage Comment author: Christopher Walsh Comment text: Could you look into the strong recurring smell around Fernley? It smells like sewage and it can be bad enough that people don’t want to be outside or open their windows. It would be helpful to get an investigative journalist help the Fernley residents get a clear answer from the City, NDEP, and any involved facilities. I was really disappointed that the smell was not disclosed by my realtor when I moved here. I enjoy Fernley and am seeing the improvements that are being made. With Appreciation Comment publication date: 9/12/26, 2:49 PM Comment source: Sewage spill near City of Fernley Municipal Well 9 Comment author: Alicia Euresti Comment text: We are all so blessed to have Pastor Matt and Mrs. Regina in this town. They have become a major part of pur family and our children adore them. Thank you both for all you do for qll of us. We love you!!!! Comment publication date: 9/6/26, 9:24 PM Comment source: Fascinating Fernley: Meet Your Neighbors at Living Faith Food Pantry