Go to main contentsGo to main menu
Wednesday, November 18, 2026 at 11:33 AM

Nevada signs onto pledge to build out Western electric vehicle charging network

Nevada signs onto pledge to build out Western electric vehicle charging network
Gov. Sandoval arriving in UNR's autonomous car, piloted solely by computers. Photo by Joey Lovato.


By Daniel Rothberg

https://thenevadaindependent.com

Governments often find themselves on two ends of the electric vehicle equation.

On one side, governments such as China and California, with considerable market power, are imposing or considering mandates that have accelerated carmakers’ efforts to bring more electric vehicles to market. At the same time, policymakers everywhere are watching vehicle penetration increase and wondering how to prepare infrastructure for a more electric fleet.

In early October, seven Western governors, including Gov. Brian Sandoval, signed onto a memo aimed at opening up region’s desolate interstate highways to electric cars. The memo builds upon the state’s strategic efforts to construct electric charging stations and Sandoval’s initiative, as the National Governors Association chair, to support advances in transportation.

Governors in Colorado, Idaho, Montana, Nevada, New Mexico, Utah and Wyoming pledged to build charging stations along 12 interstate highways that traverse their states, the memo said.

Drivers of electric cars have traditionally been confined to urban areas, where there are more charging stations. Some owners are wary to travel too far outside of their bubbles, where they might not see another charging station for hundreds of miles. The bipartisan memorandum of understanding attempts to eliminate this “range anxiety” across 5,000 miles of Western highway. Its other goals are to create policies for building charging stations. They include:

–       Create voluntary standards for managing and operating charging stations.

–       Include infrastructure in planning and development.

–       Encourage carmakers to sell and market electric vehicles in the states.

In the document signed Oct. 4, the states, which will come back with a progress report in April, argued that the “improved availability of regional electric vehicle infrastructure will increase access to our highways, promote tourism and recreation in our rural communities.”

As of July 2016, Nevada officials reported 2,104 registered electric vehicles in the state. It’s a small number, but one that has steadily risen since July 2014, when there were only 694 electric cars registered here. A recent report from utility trade group Edison Electric Institute predicted that electric vehicle sales could skyrocket by 2025, making up about 7 million cars on the road.

Nevada’s efforts to accommodate electric vehicles began in 2015 when Sandoval announced plans to build an electric highway connecting Las Vegas and Reno. In 2016, the administration opened charging stations in Beatty and Fallon. That means a trip from Reno to Las Vegas is feasible for long-range electric cars. With the next phase, expected to be completed this year, charging stations will open in Tonopah and Hawthorne, opening up Highway 95 for most cars.

Matthew Tuma, a deputy director in the governor’s Office of Energy, said the ultimate goal is to build out a network of charging stations across the state by 2020. Some of the corridors that the state is targeting include Interstate 15, Interstate 80, Highway 93 and Highway 50.

“We look at it as a real access issue,” Tuma said.

The memo, which focuses on building a charging network on Interstates 15 and 80, takes the state’s goal one step further by making it possible for electric vehicle owners to drive to Salt Lake City or Denver. Automakers such as Tesla are also building out their charging networks on some of these highways, but these stations are often proprietary. Tuma noted that all of the state-sponsored charging stations will be open to any electric vehicle, regardless of brand.

Nevada and other states plan to fund their efforts, in part, from a multi-state lawsuit against Volkswagen for violating environmental and consumer laws by subverting emissions standards. The suit resulted in a $14 billion settlement last year. Under the agreement, Volkswagen said it would invest about $2 billion in electric vehicle infrastructure. Nevada will coordinate with those efforts to avoid building duplicative infrastructure. In addition, the state will receive $5.3 million from the settlement, a portion of which will go toward electrifying its highway system.

Environmentalists see electric vehicles as a way to improve greenhouse gas emissions. Much of the environmental movement’s time is focused on the power sector, but transportation accounts a large percentage of the emissions that drive climate change. In 2013, transportation was responsible for 33 percent of Nevada’s total greenhouse gas emissions, compared to the power sector’s share of 34 percent, according to a recent report from the Nevada Division of Environmental Protection.

“Equipping 5,000 miles of freeways throughout the west with electric vehicle charging stations will help drive away the pollution from dirty transportation that harms our climate and our communities,” a Sierra Club spokesperson said in a statement. “Encouraging the rapid transition to electric vehicles is an all-around win for our climate, our public health, and our economy.”

Share
Rate

Comment

Comments

COMMENTS
Comment author: John Mueller Comment text: FERNLEY’S WATER EMERGENCY: FIVE QUESTIONS STILL NEED ANSWERS The November 12 Fernley Reporter article provides a good recap of the November 3 water emergency and the November 4 City Council meeting. First, credit where credit is due. Our city employees responded, restored operations, and took precautions to protect residents. That’s important and appreciated. But fixing the immediate problem isn’t the same as preventing it from happening again. There are five reasonable questions our community deserves answers to: 1. WHAT ACTUALLY FAILED? What was the root cause of the water treatment plant’s communication failure, and why didn’t the backup systems prevent the interruption? 2. HOW CLOSE WERE WE TO A REAL EMERGENCY? How much usable water remained in storage, and how close did we come to affecting essential services, including firefighting? 3. WHAT WILL THIS COST TAXPAYERS AND RATEPAYERS? What did the emergency cost, what additional repairs or upgrades are necessary, and how will they be funded? 4. WHO IS RESPONSIBLE FOR MAKING SURE IT DOESN’T HAPPEN AGAIN? Is there a written corrective-action plan with assigned responsibilities, measurable results, and completion deadlines? 5. HOW WILL RESIDENTS KNOW THE PROBLEM IS REALLY FIXED? Will the city publish an after-action report explaining what happened, what was learned, what has been corrected, and what still needs attention? This isn’t about pointing fingers or finding someone to blame. It’s about learning, improving, and protecting our community. We can appreciate the city’s response while still expecting transparency, accountability, and a commitment to continuous improvement. Some technical information may need to remain confidential for security reasons. But that shouldn’t prevent residents from understanding the risks, the corrective actions, and the results. The real question isn’t whether Fernley recovered from the November 3 emergency. We know it did. The question is: If the same failure happened tomorrow, would we be better prepared? That’s a conversation worth having. Our community deserves more than reassurance. It deserves measurable results. Comment publication date: 11/12/26, 1:54 PM Comment source: Fernley Council Addresses Water Emergency Comment author: Donald DeVold Comment text: Great article It’s actually spelled DeVold Thank you Comment publication date: 10/29/26, 4:58 PM Comment source: The great robbery: Strip-6 by Solis helps Vaqueros punch playoff ticket Comment author: CH Comment text: I want to start a betting 'pool' for the October, November, and December closures: 1. A dent in the pool slide. 2. A failed breaker. 3. A pebble loose in the water part (replacing all concrete) 4. Hurricane Polo makes a sudden turn and blows off the roof (again). With soft muscles after 7 months of no swimming, the only health left is my sense of humor :) Comment publication date: 10/1/26, 11:18 AM Comment source: Fernley Pool Renovation Moves Forward, One Test at a Time Comment author: PFB Comment text: Why can't you guys find competent contractors.. For a large municipal facility like the indoor-outdoor Fernley Swimming Pool located at 300 Cottonwood Lane, a complete ground-up commercial build or major structural renovation typically spans 6 to 12 months or longer when factoring in large-scale engineering, public municipal permitting, specialized commercial HVAC/roofing, and health department inspections. The current renovation has been- The Fernley Swimming Pool has been closed for approximately six to seven months since late February 2026 for a major roof replacement and facility renovation. Now you sat October. Soooo 8 months for a new roof. The picture shows no other renovations. Comment publication date: 9/17/26, 7:14 PM Comment source: Electrical problem delays Fernley pool opening Comment author: P Comment text: Relative of the Mayor is to over see this site. Anyone who knows Fernley KNOWS this is more of the who you are related to and know business in this town. VOTE THEM ALL OUT AND THE CALIFORNIA TRANSPLANTS. Comment publication date: 9/16/26, 10:31 PM Comment source: Lift Station Failure Released Untreated Sewage Comment author: Christopher Walsh Comment text: Could you look into the strong recurring smell around Fernley? It smells like sewage and it can be bad enough that people don’t want to be outside or open their windows. It would be helpful to get an investigative journalist help the Fernley residents get a clear answer from the City, NDEP, and any involved facilities. I was really disappointed that the smell was not disclosed by my realtor when I moved here. I enjoy Fernley and am seeing the improvements that are being made. With Appreciation Comment publication date: 9/12/26, 2:49 PM Comment source: Sewage spill near City of Fernley Municipal Well 9