How does it get better?
Robert Perea, The Fernley Reporter
Week 1 of producing the Fernley Reporter in print is over and done with, and what a rush it was to see it in PDF form before it was sent to the printer.
I write this on Wednesday night, anxiously waiting for morning, when it will be delivered and I can hold the thing in my hands. I’m trying to predict my emotions, but I guarantee they’re going to be more powerful than I’m prepared for.
No matter how long you work in this business, seeing your byline in print is a thrill every time, no matter how major or insignificant the story might be. In every newsroom I’ve ever worked, the first thing every reporter does is to turn to the page their story is on and see what the designers did with it and how it looks.
But this… This is different.
This isn’t like the first time I ever had my byline published, or the first time I ever had a front page story. It’s not like the first time I produced my own section as sports editor in Carlsbad, NM, it’s not like seeing my byline on freelance stories in papers like the Las Vegas Review-Journal, Fresno Bee, San Diego Union-Tribune or Honolulu Advertiser. It’s not even like the time one of my stories got picked up by the Los Angeles Times.
It's like all those times at the same time.
Making it all happen was incredible. We came close to doing this a couple years ago, but things didn’t work out. Then we went from “Maybe we’ll be able to do it someday” to literally “We’re doing it now.”
Through a 31-year career in weekly newspapers, I’ve had a hand in just about every aspect of producing weeklies. But in those cases, all the infrastructure was already in place, and I was just one piece of a machine.
This time, nothing was in place, and every day of the week and a half it took to produce that first edition there was some aspect of things that wasn’t set up, hadn’t been thought of, and needed to be arranged. All the things that you just automatically do every week have to be started from scratch.
The only reason it was possible was because of Rachel Dahl, Leanna Lehman, all the ladies in their Fallon office, and their whiz of a page designer, Christine Bryner. Their infrastructure from publishing the Fallon Post served as the template for this, and allowed us to turn “Can we do it?” into “It’s done” in barely a little over a week, things that would have otherwise taken several weeks to get set up.
Now, we get to do it over and over again, week after week.
But that’s not just the challenge in front of us, it’s the carrot at the end of the stick too.
Seeing your byline in print never gets old. Seeing it in print in a newspaper that you and your friends built from scratch? How can it get better than that?
COMMENTS
Comment author: Donald DeVold
Comment text: Great article
It’s actually spelled DeVold
Thank you
Comment publication date: 10/29/26, 4:58 PM
Comment source: The great robbery: Strip-6 by Solis helps Vaqueros punch playoff ticket
Comment author: CH
Comment text: I want to start a betting 'pool' for the October, November, and December closures:
1. A dent in the pool slide.
2. A failed breaker.
3. A pebble loose in the water part (replacing all concrete)
4. Hurricane Polo makes a sudden turn and blows off the roof (again).
With soft muscles after 7 months of no swimming, the only health left is my sense of humor :)
Comment publication date: 10/1/26, 11:18 AM
Comment source: Fernley Pool Renovation Moves Forward, One Test at a Time
Comment author: PFB
Comment text: Why can't you guys find competent contractors.. For a large municipal facility like the indoor-outdoor Fernley Swimming Pool located at 300 Cottonwood Lane, a complete ground-up commercial build or major structural renovation typically spans 6 to 12 months or longer when factoring in large-scale engineering, public municipal permitting, specialized commercial HVAC/roofing, and health department inspections. The current renovation has been- The Fernley Swimming Pool has been closed for approximately six to seven months since late February 2026 for a major roof replacement and facility renovation. Now you sat October. Soooo 8 months for a new roof. The picture shows no other renovations.
Comment publication date: 9/17/26, 7:14 PM
Comment source: Electrical problem delays Fernley pool opening
Comment author: P
Comment text: Relative of the Mayor is to over see this site. Anyone who knows Fernley KNOWS this is more of the who you are related to and know business in this town. VOTE THEM ALL OUT AND THE CALIFORNIA TRANSPLANTS.
Comment publication date: 9/16/26, 10:31 PM
Comment source: Lift Station Failure Released Untreated Sewage
Comment author: Christopher Walsh
Comment text: Could you look into the strong recurring smell around Fernley? It smells like sewage and it can be bad enough that people don’t want to be outside or open their windows.
It would be helpful to get an investigative journalist help the Fernley residents get a clear answer from the City, NDEP, and any involved facilities.
I was really disappointed that the smell was not disclosed by my realtor when I moved here. I enjoy Fernley and am seeing the improvements that are being made.
With Appreciation
Comment publication date: 9/12/26, 2:49 PM
Comment source: Sewage spill near City of Fernley Municipal Well 9
Comment author: Alicia Euresti
Comment text: We are all so blessed to have Pastor Matt and Mrs. Regina in this town. They have become a major part of pur family and our children adore them. Thank you both for all you do for qll of us. We love you!!!!
Comment publication date: 9/6/26, 9:24 PM
Comment source: Fascinating Fernley: Meet Your Neighbors at Living Faith Food Pantry
Temperature: 69°F Town: Fernley
Pressure: 1020 hPa
Wind: 4 mph

Comment
Comments