Go to main contentsGo to main menu
Sunday, November 1, 2026 at 11:00 PM
Ad

WNC reopening campuses to public on Monday

WNC reopening campuses to public on Monday
WNC campus leaders pose for a photo following the college’s safety-minded drive-through graduation ceremony last month on the Carson City campus.

Courtesy Steve Yingling, Western Nevada College

Welcome back!

Western Nevada College has maintained service to the public remotely throughout the COVID-19 pandemic. Now, the college is officially welcoming students and the public back to all campuses beginning Monday, July 27.

After conducting classes and business virtually since closing its three campuses to the public in mid-March, WNC has been given the OK by state officials to reopen in preparation for fall semester.

“We are ecstatic to be in the position to welcome back our students and community members to our campuses after months of preparing and planning for this day,” said WNC President Dr. Vincent Solis. “As we resume many of our normal activities on campus, we will keep in mind that the top priority for the college is the safety and well-being of our students, faculty, staff and community members.”

WNC is well-prepared for opening with new safety policies designed to protect the community. Following direction from the governor’s office, WNC is requiring face coverings throughout campus at all times. Hand sanitizer is readily available and social distancing has been arranged in each classroom. Many courses will be offered online for those more comfortable with remote instruction.

“WNC has always been innovative and flexible,” Dr. Solis said. “Throughout this pandemic, we have been able to quickly adapt and continue to serve our students. Now, we are taking the next steps to ensure our students continue to learn in the safest environments possible.”    

Students and visitors will be able to meet with college personnel by appointment or walk-in from 8 a.m. to 5 p.m. Monday through Friday. This will be a great time for high school dual-enrollment and new students to meet with counselors with the start of fall semester a little more than a month away on Aug. 31. 

“I’m excited to meet with our families in person,” said Director of WNC Counseling Services Piper McCarthy. “Our staff recently went through safety training and feels well-prepared to help students both in person and over the phone.”

Enrollment and other business needs can still be handled virtually through the college’s various college departments or by phoning 775-445-3000.

WNC plans to offer classes in a variety of platforms this fall to meet students’ needs, including in person, online and hybrid.

For more information on WNC’s reopening policies and phases, go to https://www.wnc.edu/wnc-announces-plan-to-resume-campus-operations/

CAPTION:


Share
Rate

Comment

Comments

COMMENTS
Comment author: Donald DeVold Comment text: Great article It’s actually spelled DeVold Thank you Comment publication date: 10/29/26, 4:58 PM Comment source: The great robbery: Strip-6 by Solis helps Vaqueros punch playoff ticket Comment author: CH Comment text: I want to start a betting 'pool' for the October, November, and December closures: 1. A dent in the pool slide. 2. A failed breaker. 3. A pebble loose in the water part (replacing all concrete) 4. Hurricane Polo makes a sudden turn and blows off the roof (again). With soft muscles after 7 months of no swimming, the only health left is my sense of humor :) Comment publication date: 10/1/26, 11:18 AM Comment source: Fernley Pool Renovation Moves Forward, One Test at a Time Comment author: PFB Comment text: Why can't you guys find competent contractors.. For a large municipal facility like the indoor-outdoor Fernley Swimming Pool located at 300 Cottonwood Lane, a complete ground-up commercial build or major structural renovation typically spans 6 to 12 months or longer when factoring in large-scale engineering, public municipal permitting, specialized commercial HVAC/roofing, and health department inspections. The current renovation has been- The Fernley Swimming Pool has been closed for approximately six to seven months since late February 2026 for a major roof replacement and facility renovation. Now you sat October. Soooo 8 months for a new roof. The picture shows no other renovations. Comment publication date: 9/17/26, 7:14 PM Comment source: Electrical problem delays Fernley pool opening Comment author: P Comment text: Relative of the Mayor is to over see this site. Anyone who knows Fernley KNOWS this is more of the who you are related to and know business in this town. VOTE THEM ALL OUT AND THE CALIFORNIA TRANSPLANTS. Comment publication date: 9/16/26, 10:31 PM Comment source: Lift Station Failure Released Untreated Sewage Comment author: Christopher Walsh Comment text: Could you look into the strong recurring smell around Fernley? It smells like sewage and it can be bad enough that people don’t want to be outside or open their windows. It would be helpful to get an investigative journalist help the Fernley residents get a clear answer from the City, NDEP, and any involved facilities. I was really disappointed that the smell was not disclosed by my realtor when I moved here. I enjoy Fernley and am seeing the improvements that are being made. With Appreciation Comment publication date: 9/12/26, 2:49 PM Comment source: Sewage spill near City of Fernley Municipal Well 9 Comment author: Alicia Euresti Comment text: We are all so blessed to have Pastor Matt and Mrs. Regina in this town. They have become a major part of pur family and our children adore them. Thank you both for all you do for qll of us. We love you!!!! Comment publication date: 9/6/26, 9:24 PM Comment source: Fascinating Fernley: Meet Your Neighbors at Living Faith Food Pantry