Go to main contentsGo to main menu
Saturday, November 28, 2026 at 9:34 AM
Ad

Learn more about WNC’s Jump Start program

Learn more about WNC’s Jump Start program
Jump Start students from high schools around the region pose before the start of the Western Nevada College 2017 Commencement in Carson City, Nev. on Monday, May 22, 2017.
Photo by Cathleen Allison/Nevada Photo Source


Courtesy Steve Yingling, Western Nevada College

Is your high school student ready to start college while still in high school?

Determining whether Western Nevada College’s dual-credit Jump Start College is right for your child depends on a variety of factors: academic readiness for college courses, individual maturity, time availability for studying and a willingness to work hard.

Now in its fourth year, the dual-credit Jump Start College serves nearly 500 high school students in seven school districts.

Besides providing high students the opportunity to earn up to an associate degree before they receive their high school diploma, it also allows them to save thousands of dollars and enter a four-year university, in many cases, with a sophomore or junior standing.

Some of WNC’s Jump Start grads have been accepted at University of Nevada, Reno; UNLV; Boise State; BYU; Cal Pol-San Luis Obispo; and Stanford, among others.

There are opportunities to learn more about the program during periodic informational meetings at local high schools or by contacting WNC.

This spring, qualified students will be notified by their high school counselor and invited to take placement testing.

For more information about WNC’s Jump Start College, go to http://www.wnc.edu/jumpstart-success/, phone Tricia Wentz at 775-445-3250 or email her at [email protected].

About Jump Start

Western Nevada College’s 2017 graduating class included a record 79 high school students representing Carson, Churchill County, Dayton, Fernley, Pyramid Lake, Silver Stage and Virginia City high schools, as well as Oasis Academy and Nevada Virtual Academy. Two additional Jump Start students graduated during summer 2017.

While many of these high school juniors and seniors need an adjustment period in their foray into college courses, nearly all of them are stepping up to the challenges. During the 2016 fall semester, there was a 96.3 percent pass rate for students enrolled in Jump Start courses and a 94.3 pass rate in the 2017 spring semester.

The highest governing official in Nevada supports the program and wants it to be available to all high school students in Nevada.

Gov. Brian Sandoval signed Senate Bill 19 into law last May, requiring all Nevada high schools to provide dual-credit opportunities to their students. Looking to educate more Nevadans — at an enhanced pace —  to spur economic growth, Sandoval wholeheartedly showed his support for the dual-credit program.

“Here, Western Nevada College has it dialed in and it’s frankly a model for the rest of the state,” Sandoval said. “This is something that we need to franchise out across the state of Nevada to ensure that all students have those opportunities to get those great jobs.

“Western Nevada is ground zero for this New Nevada that we’re all so proud of and that we’re looking forward to. This is one of those days that I’m so proud, so proud that I’m a Nevadan.”

Share
Rate

Comment

Comments

COMMENTS
Comment author: John Mueller Comment text: FERNLEY’S WATER EMERGENCY: FIVE QUESTIONS STILL NEED ANSWERS The November 12 Fernley Reporter article provides a good recap of the November 3 water emergency and the November 4 City Council meeting. First, credit where credit is due. Our city employees responded, restored operations, and took precautions to protect residents. That’s important and appreciated. But fixing the immediate problem isn’t the same as preventing it from happening again. There are five reasonable questions our community deserves answers to: 1. WHAT ACTUALLY FAILED? What was the root cause of the water treatment plant’s communication failure, and why didn’t the backup systems prevent the interruption? 2. HOW CLOSE WERE WE TO A REAL EMERGENCY? How much usable water remained in storage, and how close did we come to affecting essential services, including firefighting? 3. WHAT WILL THIS COST TAXPAYERS AND RATEPAYERS? What did the emergency cost, what additional repairs or upgrades are necessary, and how will they be funded? 4. WHO IS RESPONSIBLE FOR MAKING SURE IT DOESN’T HAPPEN AGAIN? Is there a written corrective-action plan with assigned responsibilities, measurable results, and completion deadlines? 5. HOW WILL RESIDENTS KNOW THE PROBLEM IS REALLY FIXED? Will the city publish an after-action report explaining what happened, what was learned, what has been corrected, and what still needs attention? This isn’t about pointing fingers or finding someone to blame. It’s about learning, improving, and protecting our community. We can appreciate the city’s response while still expecting transparency, accountability, and a commitment to continuous improvement. Some technical information may need to remain confidential for security reasons. But that shouldn’t prevent residents from understanding the risks, the corrective actions, and the results. The real question isn’t whether Fernley recovered from the November 3 emergency. We know it did. The question is: If the same failure happened tomorrow, would we be better prepared? That’s a conversation worth having. Our community deserves more than reassurance. It deserves measurable results. Comment publication date: 11/12/26, 1:54 PM Comment source: Fernley Council Addresses Water Emergency Comment author: Donald DeVold Comment text: Great article It’s actually spelled DeVold Thank you Comment publication date: 10/29/26, 4:58 PM Comment source: The great robbery: Strip-6 by Solis helps Vaqueros punch playoff ticket Comment author: CH Comment text: I want to start a betting 'pool' for the October, November, and December closures: 1. A dent in the pool slide. 2. A failed breaker. 3. A pebble loose in the water part (replacing all concrete) 4. Hurricane Polo makes a sudden turn and blows off the roof (again). With soft muscles after 7 months of no swimming, the only health left is my sense of humor :) Comment publication date: 10/1/26, 11:18 AM Comment source: Fernley Pool Renovation Moves Forward, One Test at a Time Comment author: PFB Comment text: Why can't you guys find competent contractors.. For a large municipal facility like the indoor-outdoor Fernley Swimming Pool located at 300 Cottonwood Lane, a complete ground-up commercial build or major structural renovation typically spans 6 to 12 months or longer when factoring in large-scale engineering, public municipal permitting, specialized commercial HVAC/roofing, and health department inspections. The current renovation has been- The Fernley Swimming Pool has been closed for approximately six to seven months since late February 2026 for a major roof replacement and facility renovation. Now you sat October. Soooo 8 months for a new roof. The picture shows no other renovations. Comment publication date: 9/17/26, 7:14 PM Comment source: Electrical problem delays Fernley pool opening Comment author: P Comment text: Relative of the Mayor is to over see this site. Anyone who knows Fernley KNOWS this is more of the who you are related to and know business in this town. VOTE THEM ALL OUT AND THE CALIFORNIA TRANSPLANTS. Comment publication date: 9/16/26, 10:31 PM Comment source: Lift Station Failure Released Untreated Sewage Comment author: Christopher Walsh Comment text: Could you look into the strong recurring smell around Fernley? It smells like sewage and it can be bad enough that people don’t want to be outside or open their windows. It would be helpful to get an investigative journalist help the Fernley residents get a clear answer from the City, NDEP, and any involved facilities. I was really disappointed that the smell was not disclosed by my realtor when I moved here. I enjoy Fernley and am seeing the improvements that are being made. With Appreciation Comment publication date: 9/12/26, 2:49 PM Comment source: Sewage spill near City of Fernley Municipal Well 9