Go to main contentsGo to main menu
Thursday, October 22, 2026 at 2:19 AM
Ad

Nevada Department of Transportation announces new executive staff member

Nevada Department of Transportation announces new executive staff member
Courtesy NDOT

The Nevada Department of Transportation has promoted Cole Mortensen as assistant director of engineering.

Mortensen will oversee pre-construction engineering for state road projects, including more than 300 NDOT project management, roadway design, bridge, environmental, location and right-of-way professionals. He began his NDOT career in 2002 as an associate engineer in the roadway design division, before spending six years in the structures and bridge arena and advancing into project management roles in 2009.

As NDOT project manager, Mortensen oversaw development of more than $3 billion in infrastructure improvements, including the state’s largest public works project, Project Neon. He has been a leader in the department’s alternative project delivery aimed at most efficiently and quickly constructing road improvements.

“As Nevada continues to grow, our state roadways connect and keep Nevada drivers and commerce mobile,” Mortensen explained. “I look forward to continuing as part of the NDOT team of professionals who design, develop and engineer the way for the road improvements that keep our state moving.”

Cole Mortensen


Mortensen holds a bachelor's and master’s degree in civil engineering from the University of Nevada, Reno and is a registered civil engineer in Nevada and California.

He replaces former NDOT assistant director of engineering John Terry. Terry retired after approximately 20 years at NDOT, during which he advanced from roadway design, hydraulic, traffic operations and project management positions to assistant director of engineering.

Share
Rate

Comment

Comments

COMMENTS
Comment author: CH Comment text: I want to start a betting 'pool' for the October, November, and December closures: 1. A dent in the pool slide. 2. A failed breaker. 3. A pebble loose in the water part (replacing all concrete) 4. Hurricane Polo makes a sudden turn and blows off the roof (again). With soft muscles after 7 months of no swimming, the only health left is my sense of humor :) Comment publication date: 10/1/26, 11:18 AM Comment source: Fernley Pool Renovation Moves Forward, One Test at a Time Comment author: PFB Comment text: Why can't you guys find competent contractors.. For a large municipal facility like the indoor-outdoor Fernley Swimming Pool located at 300 Cottonwood Lane, a complete ground-up commercial build or major structural renovation typically spans 6 to 12 months or longer when factoring in large-scale engineering, public municipal permitting, specialized commercial HVAC/roofing, and health department inspections. The current renovation has been- The Fernley Swimming Pool has been closed for approximately six to seven months since late February 2026 for a major roof replacement and facility renovation. Now you sat October. Soooo 8 months for a new roof. The picture shows no other renovations. Comment publication date: 9/17/26, 7:14 PM Comment source: Electrical problem delays Fernley pool opening Comment author: P Comment text: Relative of the Mayor is to over see this site. Anyone who knows Fernley KNOWS this is more of the who you are related to and know business in this town. VOTE THEM ALL OUT AND THE CALIFORNIA TRANSPLANTS. Comment publication date: 9/16/26, 10:31 PM Comment source: Lift Station Failure Released Untreated Sewage Comment author: Christopher Walsh Comment text: Could you look into the strong recurring smell around Fernley? It smells like sewage and it can be bad enough that people don’t want to be outside or open their windows. It would be helpful to get an investigative journalist help the Fernley residents get a clear answer from the City, NDEP, and any involved facilities. I was really disappointed that the smell was not disclosed by my realtor when I moved here. I enjoy Fernley and am seeing the improvements that are being made. With Appreciation Comment publication date: 9/12/26, 2:49 PM Comment source: Sewage spill near City of Fernley Municipal Well 9 Comment author: Alicia Euresti Comment text: We are all so blessed to have Pastor Matt and Mrs. Regina in this town. They have become a major part of pur family and our children adore them. Thank you both for all you do for qll of us. We love you!!!! Comment publication date: 9/6/26, 9:24 PM Comment source: Fascinating Fernley: Meet Your Neighbors at Living Faith Food Pantry Comment author: R Conley Comment text: Is the deputy receiving any additional training or reinforcing prior training? Comment publication date: 9/5/26, 10:08 AM Comment source: Inmate escapes from Fernley substation