Go to main contentsGo to main menu
Saturday, November 28, 2026 at 9:40 AM
Ad

Vaqueros roll past Wooster

Vaqueros roll past Wooster
Robert Perea, The Fernley Reporter

Before they’d even broken a sweat, the Fernley Vaqueros found themselves unexpectedly trailing by a touchdown against Wooster.

It might have been the best thing that could have happened to them.

Fernley responded with three touchdowns in the first quarter and rolled to a 42-14 win, to move to 7-0 in the Northern 3A, setting up their second major showdown in three weeks.

Zach Burns threw four touchdown passes and the Fernley defense completely stymied the Wooster offense after the opening possession.

Wooster opened the game with a successful onside kick, and four plays later, scored on a 36-yard touchdown pass to take a 7-0 lead.

“We got some guys up front, that they’re not known for their hands,” Fernley coach Chris Ward said with a laugh. “I think that kind of woke us up.”

Fernley answered right back on its first possession, driving for a 15-yard touchdown pass from Burns to Zac Terra to tie the game, 7-7.

The Vaqueros then caught Wooster with their own onside kick, and after a 43-yard touchdown pass from Burns to A.J. Kuha was called back because of a penalty, Willie Pritchard  scored on a 38-yard run on the next play to put Fernley ahead 14-7.

Fernley forced Wooster to punt on the Colts’ next possession, and on the fourth play of Fernley’s next drive, Burns connected with Kuha for a 36-yard touchdown pass and a 21-7 lead with 2.5 seconds left in the first half.

“I think A.J. Kuha had some big plays,” Ward said.

Fernley scored twice in the last three minutes of the third quarter to take full command.

First, Shawn Gleason scored on a 15-yard run to cap a 51-yard drive that started with a 24-yard pass from Burns to Cameron Bertok.

Then on the first play after a Wooster punt, Burns hit Cooper Henderson with a short pass that Henderson turned into a 40-yard touchdown for a 35-7 lead with 1:25 left in the first half.

“We told them at halftime that we got punched in the mouth and then we were able to bounce back,” Ward said. “I was glad how they bounced back.”

Fernley took its first possession of the third quarter 80 yards for another score, on a 5-yard pass from Burns to Russel Ortiz, after a 25-yard pass from Burns to Ortiz got the Vaqueros close to the goal line.

That put the game into a running clock, until Wooster scored on a 2-yard run by Brandon Reich with 5:13 left in the game.


Share
Rate

Comment

Comments

COMMENTS
Comment author: John Mueller Comment text: FERNLEY’S WATER EMERGENCY: FIVE QUESTIONS STILL NEED ANSWERS The November 12 Fernley Reporter article provides a good recap of the November 3 water emergency and the November 4 City Council meeting. First, credit where credit is due. Our city employees responded, restored operations, and took precautions to protect residents. That’s important and appreciated. But fixing the immediate problem isn’t the same as preventing it from happening again. There are five reasonable questions our community deserves answers to: 1. WHAT ACTUALLY FAILED? What was the root cause of the water treatment plant’s communication failure, and why didn’t the backup systems prevent the interruption? 2. HOW CLOSE WERE WE TO A REAL EMERGENCY? How much usable water remained in storage, and how close did we come to affecting essential services, including firefighting? 3. WHAT WILL THIS COST TAXPAYERS AND RATEPAYERS? What did the emergency cost, what additional repairs or upgrades are necessary, and how will they be funded? 4. WHO IS RESPONSIBLE FOR MAKING SURE IT DOESN’T HAPPEN AGAIN? Is there a written corrective-action plan with assigned responsibilities, measurable results, and completion deadlines? 5. HOW WILL RESIDENTS KNOW THE PROBLEM IS REALLY FIXED? Will the city publish an after-action report explaining what happened, what was learned, what has been corrected, and what still needs attention? This isn’t about pointing fingers or finding someone to blame. It’s about learning, improving, and protecting our community. We can appreciate the city’s response while still expecting transparency, accountability, and a commitment to continuous improvement. Some technical information may need to remain confidential for security reasons. But that shouldn’t prevent residents from understanding the risks, the corrective actions, and the results. The real question isn’t whether Fernley recovered from the November 3 emergency. We know it did. The question is: If the same failure happened tomorrow, would we be better prepared? That’s a conversation worth having. Our community deserves more than reassurance. It deserves measurable results. Comment publication date: 11/12/26, 1:54 PM Comment source: Fernley Council Addresses Water Emergency Comment author: Donald DeVold Comment text: Great article It’s actually spelled DeVold Thank you Comment publication date: 10/29/26, 4:58 PM Comment source: The great robbery: Strip-6 by Solis helps Vaqueros punch playoff ticket Comment author: CH Comment text: I want to start a betting 'pool' for the October, November, and December closures: 1. A dent in the pool slide. 2. A failed breaker. 3. A pebble loose in the water part (replacing all concrete) 4. Hurricane Polo makes a sudden turn and blows off the roof (again). With soft muscles after 7 months of no swimming, the only health left is my sense of humor :) Comment publication date: 10/1/26, 11:18 AM Comment source: Fernley Pool Renovation Moves Forward, One Test at a Time Comment author: PFB Comment text: Why can't you guys find competent contractors.. For a large municipal facility like the indoor-outdoor Fernley Swimming Pool located at 300 Cottonwood Lane, a complete ground-up commercial build or major structural renovation typically spans 6 to 12 months or longer when factoring in large-scale engineering, public municipal permitting, specialized commercial HVAC/roofing, and health department inspections. The current renovation has been- The Fernley Swimming Pool has been closed for approximately six to seven months since late February 2026 for a major roof replacement and facility renovation. Now you sat October. Soooo 8 months for a new roof. The picture shows no other renovations. Comment publication date: 9/17/26, 7:14 PM Comment source: Electrical problem delays Fernley pool opening Comment author: P Comment text: Relative of the Mayor is to over see this site. Anyone who knows Fernley KNOWS this is more of the who you are related to and know business in this town. VOTE THEM ALL OUT AND THE CALIFORNIA TRANSPLANTS. Comment publication date: 9/16/26, 10:31 PM Comment source: Lift Station Failure Released Untreated Sewage Comment author: Christopher Walsh Comment text: Could you look into the strong recurring smell around Fernley? It smells like sewage and it can be bad enough that people don’t want to be outside or open their windows. It would be helpful to get an investigative journalist help the Fernley residents get a clear answer from the City, NDEP, and any involved facilities. I was really disappointed that the smell was not disclosed by my realtor when I moved here. I enjoy Fernley and am seeing the improvements that are being made. With Appreciation Comment publication date: 9/12/26, 2:49 PM Comment source: Sewage spill near City of Fernley Municipal Well 9